Principal Engineer - Commissioning
Petrofac
13 hours ago
Posted date13 hours ago
N/A
Minimum levelN/A
EngineeringJob category
EngineeringThe Right-First-Time (RFT) Lead ensures that all construction installation activities, pre-commissioning are performed with correct quality the first time, minimizing rework and delays to commissioning & Start-up. The role integrates quality assurance, construction execution, punch management, and completions readiness to ensure systems are delivered defect-free and aligned with project specifications, ITR requirements, and commissioning priorities.
Key Responsibilities
1. Right-First-Time Quality Leadership
2. Construction Quality Verification
3. Punch Management & Resolution
4. Interface With Completions & Commissioning
5. Planning, Progress Tracking & Reporting
6. Documentation & Compliance
7. HSE Responsibilities
Qualifications & Experience
Education
Experience
Technical Knowledge
Key Skills & Competencies
Deliverables
#LI-HS1
Key Responsibilities
1. Right-First-Time Quality Leadership
- Implement and lead the Right-First-Time initiative across all construction disciplines (Mechanical, Piping, Electrical, Instrumentation, Telecom, Civil).
- Ensure correct installation quality to reduce punch items, NCRs, and rework.
- Verify construction activities follow IFC drawings, standards, vendor specifications, and method statements.
- Promote a culture of "Build It Clean, Build It Once" across the project.
2. Construction Quality Verification
- Conduct regular discipline walkdowns to verify installation quality before handing over to QA/QC or Completions.
- Ensure all field installations meet requirements for ITR completion (A, B, C check sheets).
- Identify installation gaps early and ensure corrective actions are implemented before system handover.
- Audit construction teams for workmanship, materials handling, and adherence to procedures.
3. Punch Management & Resolution
- Lead efforts to minimize punch items by preventing construction errors.
- Ensure that any punch items raised are addressed quickly and closed before Mechanical Completion.
- Track recurring punch trends and work with construction leads to eliminate root causes.
- Coordinate punch closure in line with system RFT and MC priorities.
4. Interface With Completions & Commissioning
- Align RFT activities with the Completions (MC / RFT / RFC / RFSU) sequence.
- Ensure construction delivers systems truly ready for testing-mechanically complete, punch-free, and installation-verified.
- Support Commissioning team by ensuring:
- Correct installation
- Verified cabling and tubing
- Proper equipment orientation
- Vendor requirements met
- Documentation updated
- Prevent handover of incomplete or defective systems to Commissioning.
5. Planning, Progress Tracking & Reporting
- Develop and maintain an RFT Execution Plan with weekly and monthly targets.
- Track RFT KPIs:
- % Reduction in rework
- Punch reduction rate
- Repeated error frequency
- ITR rejection trends
- Provide daily and weekly RFT status reports to Construction Manager / Completions Manager.
- Present recurring quality issues and coordinate cross-discipline corrective action plans.
6. Documentation & Compliance
- Ensure compliance with:
- Project Quality Plan
- ITRs / QA Check Sheets
- International codes (API, ASME, ANSI, IEC, ISA)
- ADNOC specifications
- Perform document reviews including IFC drawings, vendor docs, method statements, quality procedures, and red-line markups.
- Ensure all work packs and RFT dossiers are complete before system handover.
7. HSE Responsibilities
- Ensure all RFT inspections are conducted safely under the PTW system.
- Identify any unsafe installation practices and coordinate immediate corrective action.
- Support HSE during audits by providing quality-related evidence and documentation.
Qualifications & Experience
Education
- Bachelor's Degree in Mechanical, Process, Electrical, Instrumentation, or related Engineering field.
Experience
- 10-15 years oil & gas construction/commissioning experience.
- Minimum 5 years in a Quality / Completions / RFT leadership role.
- Strong experience with EPC and brownfield projects.
- Familiar with Completions Management Systems.
Technical Knowledge
- Strong understanding of construction quality requirements.
- Excellent knowledge of P\&IDs, isometrics, SLDs, loop diagrams, cable schedules.
- Ability to identify installation defects early.
- Familiar with ITR requirements for all disciplines.
Key Skills & Competencies
- Strong leadership and coordination skills.
- Ability to challenge construction teams constructively.
- Excellent knowledge of QA/QC processes.
- Proactive identification of issues before they escalate.
- Strong communication and reporting skills.
- Root cause analysis and corrective action planning.
Deliverables
- RFT Work Process & Strategy
- Weekly RFT Performance Reports
- Punch Trend Analysis & Reduction Plans
- Installation Quality Observation Reports
- RFT Checklists and Validation Records
- Input to Mechanical Completion & Handover Packages
#LI-HS1
JOB SUMMARY
Principal Engineer - Commissioning
Petrofac
Abu Dhabi
13 hours ago
N/A
Full-time
Principal Engineer - Commissioning