No experience / No degreeMAIN FUNCTIONS: Operate equipment and wells by applying operating and safety procedures and guidelines to meet daily operational plan, reduce equipment failure and efficient resources administration. TASKS AND RESPONSIBILITIES: Responsible to implement on daily work objectives, housekeeping, safety, health, environmental and security - Active participation on daily toolbox meetings and regular, reported safety meetings - Identify and implement corrective and optimization actions by the continuous surveillance of wells and equipment to ensure reliable, efficient and safe operational conditions - Function as Equipment Care Technician, and routinely use Maintenance skills in performing simple maintenance activities - Report when the alarm, emergency or emergency shutdown system is out of service - Provide detailed, clear and accurate information when changing shift, to guarantee that unit conditions are updated and ensure operations continuity - Coordinate, control and monitor maintenance jobs according with the corrective, predictive and preventive planning - Report continuously in the log book all relevant operational events and abnormal situations or deviation occurred in the work area, equipment or personnel - Take samples of products for laboratory analysis and execute field laboratory tests - Active participation on emergency response activities - Report incidents internally and escalate awareness as per the Incident Reporting Guidelines - Ensure that Operations Shift Supervisor is informed and consulted about operations activities - Ensure good communication across the work team so that issues / actions can be adequately addressed - Provide the basic facts concerning well producing problems, current production rates, and current condition of the well - Ensure that the well problem diagnostics are thorough and complete before requesting Well Work intervention operations - Ensure that the wellhead and well surface equipment are maintained and are in good working order prior to Wellwork operations taking over responsibility for the well for intervention operations - Provide assistance and support to the ongoing Wellwork operations as needed SKILLS AND QUALIFICATIONS - Completed secondary education and worked previously as a Field Technician. - Strong communications (oral & written) - High standard of Safety, Health, Environment aptitude and cultivates the same in others. - Strong knowledge of pipeline operations - Strong knowledge of safety and operations management tools and processes - Broad knowledge of Emergency Preparedness Procedures - Strong knowledge of Project Philosophy and Design Specifications - Knowledgeable of relevant regulations - Knowledgeable of relevant commercial agreements
Operating natural gas compressor stations.
Daily Round
Mechanical
Compressors
• Coolant level
• Engine oil level (pull stick)
• Compressor oil level
• Hydraulic oil level
• Fire loop pressure (data entry)
• Skid visual and audio check for coolant or oil leaks
• Panel for alarms
• All scrubber dump valves to make sure they’re not hung open
• Confirm pressure in normal operating range / Record discharge temps (data entry – cooler outlet 1,2,3,4 stage)
• Check Exhaust temps in normal operating range
• Check for loose bolts and clamps
• Flare blowdown line for icing or leaking by
• Make sure blowdown valve is not blocked in
• Check fan blades and belts for vibration and squealing
SWD pumps
• Confirm pump(s) J-O-A is in auto.
• Check containment level and sump pump(s) if level is present
• Check thrust chamber oil levels
• Visual of skid checking for leaks (pumps, seals, packings) and excessive vibration
VRUs
• Check panels for alarms/faults.
• Check oil level on compressors and skid for leaks.
• Check pressures and temperatures
LACT Skid
• Make sure no alarms and no faults are on panel
• Check oil levels in thrust chambers on centrifugal pumps
• Check oil level in LACT by pulling the dipstick
• Visual of skid checking for leaks (pumps, seals, packings) and excessive vibration
NGL skid
• Check seal pot oil reservoir level (if applicable)
• Visual of skid checking for leaks (pumps, seals, packings) and excessive vibration
Air compressors
• Check compressor & dryer panels for alarms/faults.
• Check oil levels
• Check for leaks on skids.
• Check building temperature and confirm louver operation
• Confirm auto drain dumps on tanks are functioning. Check timers.
Process
Inlet/pigging header(s)
• Check and drain levels in headers
• Sight glasses for leaks
• Check valve alignment
• Drain low points
Slug catcher(s)
• Check sight glasses and LCVs for leaks
• Confirm levels to SCADA
• Drain low points
Inlet coalescer(s)
• Check dump valves on inlet coalescer(s) to make sure no valves are hung open or leaking
• Check sight glasses for leaks
• Confirm levels to SCADA
• Drain low points
SDV panels
• Make sure air is lined up
• Confirm controls locked in auto position
Fuel gas skid
• Check dumps and sight glasses on scrubbers
• Check all control valves for leaks
• Check coolant level in heater
• Make sure heater is on and to temperature when applicable.
• Check temperatures on cryo skid where applicable
Day tanks
• Verify levels (data entry %)
• Verify pressure on 220 tank at 45psi where applicable
• Check containment level and sump pump(s) if level is present
• Verify that each day tank has a sticker indicating what’s in it.
Glycol skid
• Check level in contactor integral scrubber
• Check level in dry gas scrubber
• Check glycol pump for swinging, PRV leak by, and oil coming from gear box vent. (data entry CV)
• Check glycol level in contact tower and compare to guided wave (~50%)
• Check glycol regen level just under skim valve
• Check glycol day tank level (data entry %)
• Make sure filter pots are lined up correctly
• Check burner temperature (data entry)
• Check BTEX unit for proper operation and leaks
• Check containment level and sump pump(s) if level is present
Flare(s)
• Check level on knockouts (data entry)
• Check knockout pumps are operational and in service
• Confirm blowers are working.
• Confirm pilot(s) are burning and no smoke
• Confirm sweep gas is (data entry - 250-300 SCFH)
Tank Farm (if applicable)
• Check top of tanks for leaks (thief hatches, piping, etc).
• Check blanket gas pressure(s) (data entry)
• Check containment level and sump pump(s) if level is present.
• Check tank levels
Sump Pumps
• Check sump tank levels and verify pump is in operation
LP3/HP3
• Check sight glasses, LCV(s), H pump(s) for leaks.
• Confirm pressure is normal range. If pressure is high, find source
Sales area
• Check for leaks.
• Check level in discharge scrubber
• Check alignment of pig traps
Methanol Pumps
• Verify pumps are operating at desired rate
• Check for leaks
MCC(s)/PDC(s)
• Check control screens for alarms and bypassed devices
• Confirm units are cooling to thermostat settings.
With over 90 years' combined experience, NES Fircroft (NES) is proud to be the world's leading engineering staffing provider spanning the Oil & Gas, Power & Renewables, Chemicals, Construction & Infrastructure, Life Sciences, Mining and Manufacturing sectors worldwide. With more than 80 offices in 45 countries, we are able to provide our clients with the engineering and technical expertise they need, wherever and whenever it is needed. We offer contractors far more than a traditional recruitment service, supporting with everything from securing visas and work permits, to providing market-leading benefits packages and accommodation, ensuring they are safely and compliantly able to support our clients.
Operating natural gas compressor stations.
Daily Round
Mechanical
Compressors
• Coolant level
• Engine oil level (pull stick)
• Compressor oil level
• Hydraulic oil level
• Fire loop pressure (data entry)
• Skid visual and audio check for coolant or oil leaks
• Panel for alarms
• All scrubber dump valves to make sure they’re not hung open
• Confirm pressure in normal operating range / Record discharge temps (data entry – cooler outlet 1,2,3,4 stage)
• Check Exhaust temps in normal operating range
• Check for loose bolts and clamps
• Flare blowdown line for icing or leaking by
• Make sure blowdown valve is not blocked in
• Check fan blades and belts for vibration and squealing
SWD pumps
• Confirm pump(s) J-O-A is in auto.
• Check containment level and sump pump(s) if level is present
• Check thrust chamber oil levels
• Visual of skid checking for leaks (pumps, seals, packings) and excessive vibration
VRUs
• Check panels for alarms/faults.
• Check oil level on compressors and skid for leaks.
• Check pressures and temperatures
LACT Skid
• Make sure no alarms and no faults are on panel
• Check oil levels in thrust chambers on centrifugal pumps
• Check oil level in LACT by pulling the dipstick
• Visual of skid checking for leaks (pumps, seals, packings) and excessive vibration
NGL skid
• Check seal pot oil reservoir level (if applicable)
• Visual of skid checking for leaks (pumps, seals, packings) and excessive vibration
Air compressors
• Check compressor & dryer panels for alarms/faults.
• Check oil levels
• Check for leaks on skids.
• Check building temperature and confirm louver operation
• Confirm auto drain dumps on tanks are functioning. Check timers.
Process
Inlet/pigging header(s)
• Check and drain levels in headers
• Sight glasses for leaks
• Check valve alignment
• Drain low points
Slug catcher(s)
• Check sight glasses and LCVs for leaks
• Confirm levels to SCADA
• Drain low points
Inlet coalescer(s)
• Check dump valves on inlet coalescer(s) to make sure no valves are hung open or leaking
• Check sight glasses for leaks
• Confirm levels to SCADA
• Drain low points
SDV panels
• Make sure air is lined up
• Confirm controls locked in auto position
Fuel gas skid
• Check dumps and sight glasses on scrubbers
• Check all control valves for leaks
• Check coolant level in heater
• Make sure heater is on and to temperature when applicable.
• Check temperatures on cryo skid where applicable
Day tanks
• Verify levels (data entry %)
• Verify pressure on 220 tank at 45psi where applicable
• Check containment level and sump pump(s) if level is present
• Verify that each day tank has a sticker indicating what’s in it.
Glycol skid
• Check level in contactor integral scrubber
• Check level in dry gas scrubber
• Check glycol pump for swinging, PRV leak by, and oil coming from gear box vent. (data entry CV)
• Check glycol level in contact tower and compare to guided wave (~50%)
• Check glycol regen level just under skim valve
• Check glycol day tank level (data entry %)
• Make sure filter pots are lined up correctly
• Check burner temperature (data entry)
• Check BTEX unit for proper operation and leaks
• Check containment level and sump pump(s) if level is present
Flare(s)
• Check level on knockouts (data entry)
• Check knockout pumps are operational and in service
• Confirm blowers are working.
• Confirm pilot(s) are burning and no smoke
• Confirm sweep gas is (data entry - 250-300 SCFH)
Tank Farm (if applicable)
• Check top of tanks for leaks (thief hatches, piping, etc).
• Check blanket gas pressure(s) (data entry)
• Check containment level and sump pump(s) if level is present.
• Check tank levels
Sump Pumps
• Check sump tank levels and verify pump is in operation
LP3/HP3
• Check sight glasses, LCV(s), H pump(s) for leaks.
• Confirm pressure is normal range. If pressure is high, find source
Sales area
• Check for leaks.
• Check level in discharge scrubber
• Check alignment of pig traps
Methanol Pumps
• Verify pumps are operating at desired rate
• Check for leaks
MCC(s)/PDC(s)
• Check control screens for alarms and bypassed devices
• Confirm units are cooling to thermostat settings.
With over 90 years' combined experience, NES Fircroft (NES) is proud to be the world's leading engineering staffing provider spanning the Oil & Gas, Power & Renewables, Chemicals, Construction & Infrastructure, Life Sciences, Mining and Manufacturing sectors worldwide. With more than 80 offices in 45 countries, we are able to provide our clients with the engineering and technical expertise they need, wherever and whenever it is needed. We offer contractors far more than a traditional recruitment service, supporting with everything from securing visas and work permits, to providing market-leading benefits packages and accommodation, ensuring they are safely and compliantly able to support our clients.