RESPONSIBILITIES

  • Describes what needs to be accomplished, estimate labor hours, tools, Spares/components, and resources needed to complete different work orders.
  • Uses "quality feedback" from the Site team to optimize the FLOC Task List.
  • Reviews PM orders for technical completeness and return PM orders to gatekeeper if not complete Uses, where possible, a FLOC or Global General Task List for basis of actual plan. Follows Plan to Standard (PTS) operating discipline.
  • Discuss with Site team for field check and incorporate details in the task list for increase effectiveness.
  • When materials availability has been confirmed, store job in active backlog.
  • Identify task activities necessary to execute job plan and assign correct work centers.
  • Identify materials/tools/equipment required to perform tasks.
  • Identify/solicit safety information and requirements necessary to safely perform tasks.
  • Performs staffing density checks or staffing limitation checks to validate schedule durations.
  • Evaluates schedule deviations to assess schedule impact for proper decision making.
  • Progress Measurement Sheet & S Curve progress report preparation for Monitoring & Control of Pit-stops/Turnaround,
  • Solicit/Prepare & Review maintenance procedure and ensures all safety and hazard related issues are addressed within the job plan.
  • Linking Procedure to Job Package, as applicable in SAP.
  • Consider constructability and maintainability when developing plans
  • Scheduling - Match the need date with available resources.
  • Optimize resource capacity for the highest levels of efficiency and productivity.
QUALIFICATIONS

  • Engineering Degree in Mechanical or Chemical engineering.
  • Below 10 years with Operations/ Maintenance of large chemical/ Petro-chemical plants.
  • Expertise in SAP Maintenance Modules (PM) with minimum 6 years Hands-on experience.
  • Expertise in Primavera P6/ SAP Prometheus with minimum 4 years Hands-on experience.
  • Comfortable to collaborate with Diverse Culture & Multinational Site Teams.
  • Should be flexible in work timing to match the Site work timing. (Min 4 Hours Overlap of work time)
  • Develop/manage Task List
  • Develop Job packages
  • Effective utilization of available resources
  • Use Critical Path Methodology in job plans
  • Logical sequencing basics
  • Types of Planning constraints
  • Know which procedures and specifications are applicable