Work location: Spain
Starting Date: 1st December
Estimated Duration: 3 month
Language skills: English and Spanish (both required for communication and reporting).
Mandatory: Must hold a valid European ID
Scope of the work. This intervention focuses on the hot parts of the machine (turbine and combustion chamber) and includes inspection/review of the combustion chamber, turbine stages (including blade replacement), filter house, and air intake. During this intervention, the rotor will be removed for compressor condition verification. Implementation of Technical Improvements in Gas Turbine B (TILs)
Main Activities:
Before the start of works: Review of documentation provided by Ansaldo and preparation of a supervision plan.
During execution of works:
- Supervision and validation of results at the quality plan control points.
- Monitoring and reporting of Extra Works arising from technical findings during.
- Daily participation in technical follow-up meetings between the Plant and Ansaldo.
- Preparation of the Final Outage Report (within a maximum of 30 days after work completion).
- Supervision of maintenance activities included within the defined scope.
- Verification of compliance with technical procedures during task execution.
- Daily communication and analysis with the Plant regarding any incidents observed during activities.
- Preparation and distribution of the Daily Progress Report of activities.